Bays Environmental Remediation Management (BERM)
SIte Closures
    Site-1: Former Chemical Processing Plant, Los Angeles, California
    Agency: California Regional Water Quality Control Board (CRWQCB), Los Angeles
    Region.
    Contaminants: Methylene chloride and other chlorinated substances.
    Final Remediation Methods: In-sItu chemical oxidation, Two-Phase extraction,
    Groundwater Modeling, Patience and Persistence

    Site-2: Petroleum Fuel Service Station, Los Angeles, California
    Agency: California Regional Water Quality Control Board, Los Angeles Region
    Contaminants: Petroleum fuel hydrocarbons and MTBE
    Final Remediation Methods: Chemical oxidation, Two-Phase Extraction, Patience
    and Persistence

    Site-3: Former Auto Dealership, UST site, Buena Park, California
    Agency: County of Orange Health Care Agency
    Contaminant: Petroleum fuel hydrocarbons (gasoline) no MTBE
    Final Remediation Methods: Two-Phase Extraction for seven months of operation

    Site-4: Pipeline Release Site in Imperial, California
    Agency: California Regional Water Quality Control Board, Colorado River Basin Region
    Contaminant: Petroleum fuel hydrocarbons (Gasoline and diesel).
    Final Remediation Method: Excavation and removal. The site closure was obtained
    within one month of the leak discovery.

    Site-5: Pipeline release site, El Paso Texas.
    Agency: Texas Natural Resources Conservation Commission (TNRCC)
    Contaminant: Petroleum fuel hydrocarbons
    Final remediation method: Reviewing old files, site visit, re-submit closure report,
    patience and persistence.

    Site-6: Petroleum Fuel Bulk Terminal
    Agency: CRWQCB, Los Angeles Region
    Contaminant: Petroleum fuel hydrocarbons
    Final Remediation Method: Detailed assessment and presentation of results with
    data indicating a third party source
SUMMARIES OF SELECT SITE CLOSURES BY OUR TEAM
Note: Pictures are not related to sites